Stage
Tech on site · 1 of 4 IGUs swapped · estimated complete 11:45 AM
Measurement Sheet
| Loc | Opening | DLO (W×H in) | Glass Spec | Status |
|---|---|---|---|---|
| 1 | Kitchen window over sink | 28 × 36 | 5/8" Cardinal LoE-366 IGU, argon, warm-edge | Installed |
| 2 | Master bath casement | 24 × 18 | 5/8" Cardinal LoE-366 IGU, obscure pattern | In Progress |
| 3 | Bedroom 2 (front) | 36 × 48 | 5/8" Cardinal LoE-366 IGU, argon | Pending |
| 4 | Bedroom 3 (back) | 36 × 48 | 5/8" Cardinal LoE-366 IGU, argon | Pending |
Measured by Mike Henson · Apr 14 · All units verified ASTM E2190 compliant · Field tolerance ±1/16"
Materials Pulled
| SKU | Item | Qty | Bin | Status |
|---|---|---|---|---|
| CRD-IGU-2836 | IGU 28x36 LoE-366 | 1 | A-12 | Used |
| CRD-IGU-2418-OBS | IGU 24x18 obscure | 1 | A-12 | In Use |
| CRD-IGU-3648 | IGU 36x48 LoE-366 | 2 | A-13 | Staged |
| CRL-GZ-30 | Glazing tape 3/8" x 30ft | 2 | B-04 | Loaded |
| DOW-995-BLK | Dow 995 silicone (black) | 3 | B-08 | Loaded |
Photos (3)
🏠
Before
🔧
During
📷
9:42 AM
Tech Notes
8:14a — Arrived. Customer let in via side gate. Dog secured.
8:30a — Kitchen IGU swap done. Old unit had visible failed seal/condensation.
9:15a — Master bath glazing tape removed; setting new IGU now.
Activity
✅
Mike HensonToday, 8:32 AM
Completed Opening 1 (Kitchen) — old IGU had failed seal
📍
SystemToday, 8:14 AM
Mike arrived on site — geofence triggered
🚚
SystemToday, 7:48 AM
Dispatched — ETA 8:15 AM · texted customer
🚚
Mike HensonToday, 7:30 AM
Loaded all 4 IGUs + glazing tape + Dow 995 from L-shop
📦
SystemApr 24, 2:10 PM
Cardinal IG delivery received — all 4 IGUs verified
📝
Catherine WhitakerApr 16, 11:04 AM
Signed estimate · deposit collected $920
📅
SystemApr 14, 9:22 AM
Job created from EST-2026-0488