NIGHTSHIFT
Stage
New
Estimated
Sold
Scheduled
In Progress
Complete
📅
Scheduled May 8 · 8:00 AM · Doc Holliday + Ryan Tucker · 4-hour install · Customer confirmed via SMS Apr 24
Pre-Install Checklist
7 of 8 complete
Template approved by customer (Apr 22)
Glass cut at fab shop (60x76 + 18x76 return)
Glass tempered — Anchor-Ventana (ASTM C1048)
Hardware kit pulled — CRL brushed nickel pivot
Header bar fabricated 64" SS
Customer confirmed appointment (SMS)
Sealant + setting blocks loaded on truck L-204
Day-of: confirm wet wall is dry & level (tech on arrival)
Measurements (template approved)
ElementDimensionGlassEdgeStatus
Door panel28" W × 76" H3/8" tempered low-iron StarphireAll polished, 1" hinge cutoutsCut & tempered
Return panel32" W × 76" H3/8" tempered low-iron StarphireAll polished, U-channel bottomCut & tempered
Header bar64" LSS brushed nickelMitered endsFabricated
Templated by Doc Holliday on Apr 20 · Out-of-plumb 1/4" L-to-R noted · door swings into bath
Parts Staged for Truck Loadout
SKUItemVendorQtyStatus
FAB-SHWR-60x76Custom door panel 28x76In-house fab1Tempered
FAB-SHWR-RET-32x76Return panel 32x76In-house fab1Tempered
CRL-PPH02BNPivot hinge kit, brushed nickelCRL1Pulled
CRL-HDRS-64BNHeader bar 64" stabilizerCRL1Pulled
CRL-DH28BNDoor handle/towel bar 18" BNCRL1Pulled
DOW-795-CLRDow 795 clear siliconeVendor stock2Loaded
Activity
💬
SystemApr 24, 4:12 PM
SMS confirmation sent — customer replied "yes"
🔧
Anchor-VentanaApr 23, 11:30 AM
Tempering complete · 2 panels picked up by L-204
💾
Doc HollidayApr 22, 3:55 PM
Template approved by Catherine · sent to fab
📍
Doc HollidayApr 20, 9:00 AM
On-site templating · 45 min
📝
Catherine WhitakerApr 18, 6:14 PM
Signed estimate · 50% deposit collected $1,820
📅
SystemApr 17, 10:00 AM
Job created from EST-2026-0501