Pipeline Stage
Install: May 8 (10 days out) · glass on order from Cardinal · ETA May 5.
Estimates (1 signed)
+ New Estimate
EST-2026-0492
Signed
50% Deposit Paid
Frameless walk-in — 3/8" Starphire ultra-clear, 92" tall, brushed nickel CRL hardware. Custom 6mm bottom seal.
$4,820
Approved Apr 17, 2:38 PM
Activity
📅
Install scheduled May 8Apr 22, 9:14 AM
Booked Marcus + Tyler 8am-2pm. Glass ETA May 5 from Cardinal Lexington branch.
💵
Deposit receivedApr 18, 11:02 AM
$2,410 (50%) paid via card. Stripe charge ch_3PFkW2… Synced to QuickBooks.
🏆
Estimate signed at homeApr 17, 2:38 PM
Catherine signed iPad. Picked Option B (Starphire + brushed nickel). Marcus collected room dimensions for shop drawing.
🏠
Marcus Rivera (Estimator)Apr 17, 2:00 PM
In-home consult at 4847 Tates Creek. Walked through hardware finishes; she liked brushed nickel best to match her vanity.
✉
Philip SchultzApr 15, 9:12 AM
Sent v1 estimate w/ 3 hardware options (chrome, brushed nickel, matte black). Asked her to pick before in-home Friday.
📞
Philip SchultzApr 12, 3:30 PM Connected
10-min call. Catherine wants frameless, hates the existing bypass. Wedding is May 30 so deadline is firm.
📝
Note — Philip SchultzApr 10, 4:15 PM
Catherine asked about shower while we were already at the house for IGUs. Spinning off as separate project so we can track install timeline cleanly.
📱
Project createdApr 10, 4:10 PM
OPP-2026-0412 created from existing customer Catherine Whitaker. Linked to Tates Creek property.