NIGHTSHIFT
Job Lifecycle
✓ All stages complete
Scheduled
Apr 12
Arrived
Apr 16 · 8:55a
In Progress
Apr 16 · 9:00a
Completed
Apr 16 · 12:30p
Invoiced
Apr 16 · 1:42p
Paid
Apr 16 · 4:18p
Completed Apr 16 · 9:00 AM – 12:30 PM · Mike Henson + Apprentice DeShawn · 3.5h on-site · Customer signed off · Invoice paid (CC) Apr 16 4:18 PM
Closeout Checklist
✓ 8 of 8 complete
Site protection laid (drop cloths, corner guards)
Old surface prepped (paint scraped, wall plumb verified)
J-channel installed level (confirmed with 4ft level)
Mirror placed and shimmed (4 shims, top-to-floor flush)
Sealed with mirror mastic (CRL MM-100, 4 vertical beads)
Trim/cleanup complete (mastic excess wiped, debris bagged)
Walkthrough with customer (Catherine satisfied, no callbacks needed)
Photos captured & uploaded (8 photos, before/during/after)
Materials Used
ItemVendorSKUQtyCost
96"×120" 1/4" low-iron mirror, polished edge Cardinal IG MIR-LIPE-1/4-9612 1 $1,180
J-channel 4ft brushed silver CRL JC-48-BS 4 $140
Mirror mastic + setting blocks kit CRL MM-KIT-100 1 $85
Site protection / cleanup supplies 1 $15
Subtotal materials (internal cost) $1,420
Margin: 40.3% · Glass pulled from Cardinal IG order #CIG-2026-1188 · J-channel from L-204 stock
Tech Notes — Mike Henson
Apr 16, 2026
📍
Mike Henson8:55 AM
Arrived at 4847 Tates Creek. Catherine met us at the door. Truck staged in driveway.
🛡
Mike Henson9:10 AM
Site protection laid. Old wall plumb-checked, +1/4" out of plumb at 7ft height. Shimmed J-channel to compensate.
📏
Mike Henson10:35 AM
J-channel installed and leveled along bottom run. Confirmed mirror dimensions match template.
🪞
Mike Henson11:05 AM
Mirror in place. 4 shims set. Top edge flush against ceiling trim. Mastic applied 4 vertical beads.
🗣
Mike Henson12:15 PM
Walkthrough with Catherine. Showed mastic cure timeline (24h before contact). She loves it.
Mike Henson12:25 PM
Customer signed off · 5★ · photos uploaded · paid via CC at 4:18 PM
Customer Signoff
5-star rating
★★★★★
Captured on tablet at 12:25 PM · Apr 16, 2026
“Mike was professional and on time. Mirror looks beautiful. Highly recommend.”
Customer Signature
Catherine Whitaker Apr 16, 2026 · 12:25 PM
Signed via tablet on-site
Photo Gallery (4 of 8)
Before — empty foyer wall
During — J-channel install
After — completed mirror
Closeup — polished edge detail
All 8 photos uploaded by Mike Henson on Apr 16 at 12:24 PM · auto-tagged to job & project · high-res available