Mockup — Field Ops · Fab Order detail
← back to Fab Shop
N
NIGHTSHIFT
Home
CRM
Field Ops
Team
Glass Doctor of Lexington
Today
Dispatch
Closeout
Purchase Orders
Fab Shop
Inventory
Warranties
Truck Loadout
Glass Doctor · Lexington
Field Ops
·
Fab Shop
·
FAB-2026-088
FAB-2026-088 · Mirror polish 36×72 ¼"
→ tied to
GD-10843 · Pritchard guest shower
·
Amanda Pritchard
· sold 4/22 · install 4/29
Print fab sheet
← Back to queue
●
Queued
4/22 5:14p
◐
Cut
4/24 11:02a · current
◑
Fabricate
due 2:30p
◒
QC
—
●
Built
—
✓
Ready
—
Composition makeup
Spec captured from measure 4/22 · matches measure-sheet line 3
VIP customer
Glass type
Silvered mirror
Industry-grade · safety-backed (CPSC 16 CFR 1201 II)
Thickness
¼"
(6mm)
Standard residential mirror
Panel dimensions
36" × 72"
±1/16" tolerance · single panel
Edgework
Polished — all 4 edges
Flat polish, 1/8" radius softened corners
Tempering / heat-soak
— not required
Mirror does not require temper for this application
IG cavity spec
— n/a (mirror, single pane)
No spacer / argon-fill
Special-order notes
Customer flagged "must match existing master bath mirror" — verify Pritchard's
master bath silver tone (warm)
before pull. Photos in measure folder.
Panel diagram
scale ~1:12
36"
72"
Polished edges (4)
silvered ¼" + safety backing
Tied to job
GD-10843
Pritchard guest shower — frameless
2104 Tates Creek Rd, Lexington
Line item this fulfills
Line 3
· Mirror 36×72 ¼" polished + safety
flagged
make
on measure
Customer
Amanda Pritchard →
VIP
Repeat (3 jobs)
Shop tech assignment
Auto-assigned by skills match · re-assignable from queue
Re-assign
CB
Chris Bailey
Shop lead · cut + polish certified · 12yr exp
★ Pritchard's preferred tech (customer flag)
Open tech profile
Completion log
11:02a
Chris Bailey
pulled stock sheet S-204 (48×96 ¼"). Cut diagram from optimizer batch FAB-CUT-2026-038.
11:08a
Chris Bailey
made primary 36×72 cut.
Photo logged ↓
11:14a
Chris Bailey
registered remnant 24×24 → returned to stock as RM-2026-051.
11:22a
Status transition
queued → cut
. Awaiting fab slot — edge polish station 2:30p.
Photos · 3
S-204 pull
cut layout
RM-051 tag
add
Lifecycle actions · firing material_ready event triggers downstream
job
unlock
↻ Send back to cut
⚑ Flag for QC review
✓ Mark built
FAB-2026-088 actions
Mark built
FAB-088
Print fab sheet
Send back to cut
Flag for QC review
Re-assign tech
Navigate
Back to Fab Shop queue
Open tied job — GD-10843
Pritchard
Open customer — Pritchard
Open Cut Optimizer
Today
Dispatch Board
Closeout
Purchase Orders
Inventory
Warranties
Truck Loadout
↑
↓
navigate
⏎
select
esc
close