Mockup — Field Ops · Purchase Orders← back to Field Ops gallery
Today Dispatch Closeout Purchase Orders Fab Shop Inventory Warranties Truck Loadout
Glass Doctor · Lexington
Field Ops·Purchase Orders

Purchase Orders

Order materials. Track ETAs. Unlock jobs when stock arrives.
+ Create PO
Need to order
5$12.8k blocked
oldest: 2d
Open POs
8
$28.4k committed
Received today
3+$7.5k
2 jobs unlock
Ready to unlock
2
$10.7k
Waiting >7d
1
SLA escalate
ETA Timeline — Next 7 Days
Confirmed delivery windows by day · click a day to filter PO list
MON
Apr 27
1
TUE
Apr 28
2
WED
Apr 29
THU
Apr 30
1
FRI
May 1
SAT
May 2
1
SUN
May 3
Arriving today This week End of week / tight Confirmed ETA
Need to order — 5 jobs
Sold/measured but no PO placed yet. Each one is blocked revenue until ordered.
Auto-create POs from measure
shower Pritchard guest bath — frameless shower VIPUrgent
GD-10856 · Just booked Apr 24 · Measure scheduled Sat with Chris · 3-week deadline (houseguests)
$3,200
est COGS $920
Generate PO
IGU Morales bay window — IGU replacement Quote sent
GD-10852 · Measured 2d ago · Quote approved 4h ago · CRL clear IGU x2 · 21x32 + 21x36
$1,890
est COGS $620
Generate PO
IGU UK Good Sam — door lite tempered Commercial
GD-C-2048b · Add-on to existing job · Sam to verify dimensions today · 36×84 1/4" tempered, 2 panels
$2,400
est COGS $880
Generate PO
storefront Kennedy storefront — Hamburg Commercial
GD-C-2051 · Sold yesterday · Net 45 customer · HMI 4500 alum + 5x 1" IGU low-E
$3,750
est COGS $1,420
Generate PO
shower Williams pool fence — frameless
GD-10859 · Sold 2d ago · Deposit paid · 5/16" tempered x 6 panels
$1,560
est COGS $480
Generate PO
Arriving
Pre-stage installs based on confirmed vendor ETAs · grouped by arrival window
▶ Today · Sat Apr 25
2 POs · $3,200 · expect dock arrival ≤ 4pm
PO-20260415-0146 FHC In transit arriving today
Bennett · pivot hinge set, brushed steel · UPS 1Z…7842
$200
ETA today 2–4p
Receive
PO-20260420-0152 310 Glass Will-call pickup today
Hopkins · 1/4" tempered IGU x2 · ready for shop pickup
$3,000
Ready 11a
▶ This week · Mon Apr 27 – Fri May 1
3 POs · $3,000 · pre-stage installs now
PO-20260416-0147 310 Glass Acknowledged Tue
Pritchard · shower master bath · 4 panels + door · Chris install Tue/Wed
$1,120
Tue Apr 28
Pre-stage
PO-20260415-0145 310 Glass In production Sat
Bennett · pivot panel rebuild · cut date confirmed Apr 30
$1,480
Sat May 2
Pre-stage
PO-20260418-0150 CRL Shipped Thu
Caldwell · mirror clips + edge polish kit · FedEx 7894…3201
$420
Thu Apr 30
Pre-stage
▶ Next week · Mon May 4 – Fri May 8
2 POs · $3,580 · heads-up for scheduling
PO-20260420-0151 310 Glass Acknowledged Tue
Adams · IGU x4 + bay window · standard 9-day lead
$2,800
Tue May 5
PO-20260415-0146-B FHC Acknowledged Wed
Bennett follow-up · finish cap + sweep replacement
$780
Wed May 6
▶ Beyond / at risk
1 PO · long lead or slip risk
PO-20260402-0120 HMI In production Commercial slip risk
Keeneland · Tubelite 4500 + entry door frame · 3-week lead, mill backed up
$14,400
May 15 (±3d)
Doc: 2 jobs unlock today + 3 install slots open this week. Auto-generated install proposals waiting for your approval in Optimizer.
Open in Optimizer →
In-flight — ETA timeline
Sent · Ack · In production · Shipped · Received
5 active
PO-20260415-0145 310 Glass In production
Bennett · Shower rebuild — pivot door
$1,480
ETA 05-02
PO-20260416-0147 310 Glass Acknowledged
Pritchard · Shower master bath (4 panels + door)
$1,120
ETA 04-28
PO-20260415-0146 FHC Sent
Bennett · Pivot hinge set, brushed steel
$200
ETA 04-25
PO-20260402-0120 HMI In production Commercial
Keeneland · Tubelite 4500 + entry door frame
$14,400
ETA 05-15
PO-20260402-0121 310 Glass Acknowledged Commercial
Keeneland · 1" IGU low-E #2 (12 units) + door lites
$3,800
ETA 05-10
Received today
3 POs · triggers ready_to_schedule on linked jobs
PO-0151 · 310 Glass · Mirror 96x48 polished
Whitaker · Custom gym mirror wall
$340
+1 unlocked
Schedule
PO-0149 · 310 Glass · 1" IGU x3
Liao · Kitchen + living IGU replacement
$420
already scheduled
Open
PO-0132 · 310 Glass · 14× 1" IGU low-E (commercial)
UK Good Sam · Patient tower
$6,800
already scheduled
Open
Vendor follow-ups 2
SLA breach watch
PO-20260415-0145 310 Glass 7d no ETA
Bennett · ordered Apr 17 · acked Apr 17 but ETA never confirmed
$1,480
SLA breach
PO-20260418-0149 FHC 3d no ack
Bennett · Pivot hinge set · sent Apr 21 · still no acknowledgement
$200
~7d typical lead
Create new PO
Auto-create POs from measure5 jobs
Sync vendor portals
Go to Dispatch board
Go to Jobs list