NIGHTSHIFT
Lifetime Spend
$71,500
8 yrs · 14 homes
Homes Built
14
2 currently active
Avg Job Value
$5,107
Across all jobs
Last Activity
4d ago
IGU warranty discussion
Builder Account — Special Billing
Trade Pro
Bill To: Watts Construction LLC (NOT homeowner)
Net 15 terms · 15% builder discount auto-applied to all line items
Every invoice must include: Lot # · Address · Watts PO#
Service History
14 jobs · showing 8
DateJob #PropertyTechStatusTotal
Apr 16, 2026 J-2026-0445 4847 Tates Creek (Whitaker — sub) Mike Henson Completed $2,380
Mar 12, 2026 J-2026-0398 Lakeshore Ct spec home Mike Henson Completed $4,840
Feb 28, 2026 J-2026-0376 Lot 8 master shower Doc Holliday Completed $4,820
Jan 14, 2026 J-2026-0241 Lot 6 IGU package Mike Henson Completed $7,880
Nov 18, 2025 J-2025-2912 Lot 4 whole-house glass Mike Henson Completed $13,420
Sep 22, 2025 J-2025-2540 Lot 3 spec home Eric W. Completed $11,200
Jun 8, 2025 J-2025-1968 Lot 1 warranty IGU Doc Holliday Warranty $0
Mar 22, 2025 J-2025-1115 Lakeshore Ct spec Mike Henson Completed $6,440
Activity Timeline
📧
Philip SchultzApr 25 · 2:14 PM
Sent revised Lot 14 IGU spec PDF to Travis — switched to Cardinal LoE-366 with stainless spacer to address the seal-failure pattern from prior homes.
🏠
Philip SchultzApr 22 · 10:30 AM On-Site
Walked Lot 14 framing w/ Travis — final glass dimensions confirmed for 18 IGUs. Drywall starts week of May 11. Need spec lock by May 4.
🤝
DonnaApr 18 · 9:45 AM AI
Coordinated with Whitaker (Travis's framing sub) to confirm rough opening dimensions on Lot 14 master suite — pulled from shared Drive folder, posted to job thread.
📞
Philip SchultzApr 12 · 8:20 AM Connected
Travis called re: warranty pattern. 3 of 14 homes have IGU seal failures at 18–24 mo. Wants vendor review before Lot 14 order. 22 min.
📄
Philip SchultzApr 4 · 4:15 PM
Proposal sent — Lot 14 whole-house glass package, EST-2026-0421 v2 ($14,720). Travis flagged budget tight, asked for v3 with itemized line-by-line.
Messages
SMS
Phil — got the v3 estimate, thanks for breaking it out. Cardinal IGUs look right. Can we lock pricing if I send the PO Friday?
Travis Watts · Apr 25, 4:08 PM
Yes — PO by Fri locks v3 numbers. I'll hold the Cardinal allocation through May 9. Drywall start May 11 still tracking?
Philip Schultz · Apr 25, 4:21 PM · Read
May 11 confirmed. One more thing — is Mike Henson available for the IGU set? He did Lot 8, knows our spec.
Travis Watts · Apr 25, 4:33 PM
Mike's already on the schedule for it. Want me to add Doc as backup in case the order gets stretched across two days?
Philip Schultz · Apr 25, 4:40 PM · Read
Perfect. PO Friday. Talk then.
Travis Watts · Apr 25, 4:42 PM